15.06.2015 June 15, 2015 a pre-biding meeting was held in R2E2 for the Implementation of the  Construction of access road, water supply infrastructure and the rig pad, GEDP-CW-1/2015, in Karkar geothermal area in the frames of Geothermal exploratory drilling project:

Representatives of construction and design companies, as well as Fund’s experts took part in the meeting. The main purpose of the meeting is to present the bid preparation, submission and evaluation procedures of energy efficient measures for the interested parties. Fund’s procurement specialist Arthur Grigoryan presented the biding package in details and highlighted the importance of the main points, qualification and contract requirements, as well as the reasons for the rejected applications. Environmental expert from R2E2, Hmayak Avagyan presented the detailed requirements for construction.

  • Waste management
  • Construction camp management
  • Biodiversity Conservation
  • Erosion control and soil conservation
  • Protection of cultural resources
  • Construction and operation of drilling fluid concentrator
  • Water Supply Management
  • Management of fuels and hazardous materials
  • Road traffic management
  • Health and safety of workers
  • Emergency preparedness and response
  • Emergency Preparedness and Response Plan
  • Involuntary resettlement
  • Involvement of local labor in construction working process