“Increase of Domestic Gas Supply System Operation Level” Project

new-image

Workshop on   “Increase of domestic gas supply system operation level” project took place in “A-E-G Service” LLC Head office in May 4, 5 2011.  The project has developed R2E2 Fund.  The  objective of the project  was to ensure supply of  qualified and  affordable  services, and create   mutually beneficial relations between the organization providing domestic gas  systems and  companies introducing domestic gas supply equipment, construction assembling activities in  heat market of Armenia, supporting   in  solution  of various problems in the sector.
On the first day the workshop was planned for the members of staff.  Fund specialists Tigran Sekoyan and Hrant Ter-Gabrielyan gave speech on the following subjects:

Brief information about  domestic boilers in Armenia, existing  brands, models, types

Energy efficiency

Energy audit

Normative documents, thermal/heat computation

Condensate boilers

Cascade boiler house

Selection of boiler

Technical provision, disorder

Materials include sketches, video and animation films. Presentations were held /passed with discussions, questions and answers.
On the second day the carpenters from  Yerevan, Gyumri, and Vanadzor were invited to participate in the workshop. The experts of the Fund presented the main issues concerning importing, installation and technical provision of domestic wall boilers in Armenia. The participants were briefly introduced   with the thermal computation, structural characteristics of the boilers, operation principals of condensate boilers; video and animation films were shown. Afterwards representatives of number of leading companies in Armenia represented boilers, which were imported and installed by their companies, their structure, technical specifications, operation methods, particularly:

  • “Artklima” LLC represented condensate boilers BOSCH and FEROLI  ,
  • “Mekusich : PC represented  boiler   DAEWOO,
  • “Thermosis” LLC represented boiler  SAUNIER DUVAIL
  • “Tun Kompleks” LLC represented condensate boilers BERETTA and IMMERGAS

The participants of the workshop were introduced the component parts of the boilers, principles of their operation, characteristics. Several issues were explained concerning the subject.
At the end of the workshop Fund expert Tigran Sekoyan claimed that the “A-E-G Service” LLC and R2E2 Fund will undertake measures to continue further cooperation