{"id":8422,"date":"2023-01-18T11:53:53","date_gmt":"2023-01-18T11:53:53","guid":{"rendered":"https:\/\/old.r2e2.am\/?p=8422"},"modified":"2023-01-18T12:13:38","modified_gmt":"2023-01-18T12:13:38","slug":"energy-saving-measures-in-policlinic-n-8-cjsc","status":"publish","type":"post","link":"https:\/\/old.r2e2.am\/en\/2023\/01\/18\/energy-saving-measures-in-policlinic-n-8-cjsc\/","title":{"rendered":"Invitation for Bids (IFB)- Energy Saving Measures in Policlinic N 8 CJSC"},"content":{"rendered":"<p><\/p>\n<h3><\/h3>\n<p><span style=\"color: #000000;\">\u00a0Date: <strong>January 18, 2023<\/strong>\u00a0<\/span><br \/>\n<span style=\"color: #000000;\"><span style=\"font-size: 1rem;\">Contract Identification No.:<\/span><strong style=\"font-size: 1rem;\"> EFSD -W\/1\/2023<br \/>\n<\/strong><strong>EFSD Grant<br \/>\n<\/strong>Project Name: <strong>&#8220;Energy Efficient Regions: Introducing <\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>Mechanisms to Increase Energy Saving\u00a0<\/strong><strong style=\"font-size: 1rem;\">in Public Buildings and Promoting \u201cGreen Energy&#8221;<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">The Republic of Armenia has received a grant from <strong>Eurasian Fund for Stabilization and Development (hereinafter &#8211; EFSD)<\/strong> towards the cost of <strong>&#8220;Energy Efficient Regions: Introducing Mechanisms to Increase Energy Saving in Public Buildings and Promoting \u201cGreen Energy&#8221; <\/strong>and intends to apply part of the funds to cover eligible payments under the Contracts for: <strong>EFSD -W\/1\/2023, Energy Saving Measures in Policlinic N 8 CJSC. <\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>The Armenia Renewable Resources and Energy Efficiency Fund<\/strong> acting as the Project Implementation Unit (PIU) invites sealed Bids from eligible Bidders for performance of works: <strong>EFSD -W\/1\/2023, <\/strong><strong>Energy Saving Measures in Policlinic N 8 CJSC.<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">Bidding documents in Armenian language shall be obtained by sending a request letter to the following E-mail <span style=\"color: #0000ff;\"><a href=\"mailto:zaruhi.gharagyozyan@r2e2.am\">zaruhi.gharagyozyan@r2e2.am<\/a>.<\/span> Hard copy of bidding documents may be\u00a0 obtained against payment of <strong>50,000 AMD<\/strong> to the Special Account of the R2E2 Fund specified below and submission of invoice (hard copy submitted to the R2E2 Fund, or scanned version of original sent via) to the <strong>Armenia Renewable Resources and Energy Efficiency Fund, 29\/1 Sayat-Nova, Yerevan, Armenia<\/strong>. Electronic version of bidding documents may be obtained <strong>Free<\/strong>, via E-mail. Interested Bidders may obtain further information at the same address.<\/span><\/p>\n<p><span style=\"color: #000000;\">The <strong>R2E2 Fund<\/strong> will arrange a Pre-bid Conference on <strong>February 2, 2023.<\/strong> During the conference, will be clarified all the issues related to preparation of Bids. Not participation in the pre-bid conference will not be a ground for rejection of a bid.<\/span><\/p>\n<p><span style=\"color: #000000;\">Bids shall be valid for a period of 90 days after Bid opening and must be accompanied by <strong>Bid Securing Declaration. <\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">Bidding will be conducted through the National Competitive Bidding (NCB) as specified in\u00a0the Procurement Policy for projects financed by the EFSD\u00a0(last updated on November, 2018), the Procurement Procedures for projects financed by the EFSD (last updated on \u00ad\u00ad\u00adNovember, 2018) (Policy and Procedures posted on <span style=\"color: #0000ff;\">https:\/\/efsd.org\/en\/about\/documents\/policies_and_procedures\/<\/span>), and the Bidding Documents.<\/span><\/p>\n<p><span style=\"color: #000000;\">Bidding is open to all Bidders complying with the eligibility criteria as defined in the Procurement Policy for projects financed by the EFSD and meeting the qualification criteria\/requirements as defined in the Bidding Documents.<\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>Qualification requirements include, but not limited:\u00a0<\/strong><\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Average annual financial amount of construction works performed for the last three years:\u00a0<strong style=\"font-size: 1rem;\">63,000,000 AMD.<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Experience as prime contractor in the performance of at least two civil works contracts (including Heating, Ventilation, Air Condition (HVAC), Energy Efficiency Measures (EEM), Photo Voltaic (PV)) of similar nature, size and complexity over the last 5 years \u00a0(to comply with this requirement, works cited should be at least 70 percent complete): \u00a0<strong>9,800,000 AMD for each contract<\/strong>.<\/span><\/li>\n<li><span style=\"color: #000000;\">Liquid assets and\/or credit facilities, net of other contractual commitments, of no less than: <strong>7,000,000 AMD. <\/strong><\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\">Bids shall be delivered to the<strong> Armenia<\/strong> <strong>Renewable Resources and Energy Efficiency Fund, 29\/1 Sayat-Nova, Yerevan 0019, Armenia<\/strong> on or before <strong>15:00, February 17, 2023<\/strong>.<\/span><\/p>\n<p><span style=\"color: #000000;\">Electronic bidding shall not be permitted. Late Bids will be rejected and returned unopened to the Bidders. Bids will be opened physically in the presence of the Bidders\u2019 representatives who choose to attend in person<em>.<\/em><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>Information for obtaining a hard copy of bidding documents:<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">Armenia Renewable Resources and Energy Efficiency Fund<\/span><br \/>\n<span style=\"color: #000000;\">Tax Identification Number 02580459<\/span><br \/>\n<span style=\"color: #000000;\">Special account\u00a0 \u00a02050422345051002<\/span><br \/>\n<span style=\"color: #000000;\">Inecobank CJSC<\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>Armenia<\/strong> <strong>Renewable Resources and Energy Efficiency Fund<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>29\/1 Sayat-Nova, Yerevan 0019, Armenia<br \/>\n<\/strong>Phone: + (374 10) 545-121<\/span><br \/>\n<span style=\"color: #000000;\">E-mail: zaruhi.gharagyozyan@r2e2.am<\/span><br \/>\n<span style=\"color: #000000;\">Web site: www.r2e2.am<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>\u00a0Date: January 18, 2023\u00a0 Contract Identification No.: EFSD -W\/1\/2023 EFSD Grant Project Name: &#8220;Energy Efficient Regions: Introducing Mechanisms to Increase Energy Saving\u00a0in Public Buildings and Promoting \u201cGreen Energy&#8221; The Republic of Armenia has received a grant from Eurasian Fund for Stabilization and Development (hereinafter &#8211; EFSD) towards the cost of &#8220;Energy Efficient Regions: Introducing Mechanisms &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/old.r2e2.am\/en\/2023\/01\/18\/energy-saving-measures-in-policlinic-n-8-cjsc\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Invitation for Bids (IFB)- Energy Saving Measures in Policlinic N 8 CJSC&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/8422"}],"collection":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/comments?post=8422"}],"version-history":[{"count":2,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/8422\/revisions"}],"predecessor-version":[{"id":8428,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/8422\/revisions\/8428"}],"wp:attachment":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media?parent=8422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/categories?post=8422"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/tags?post=8422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}