{"id":739,"date":"2017-02-02T21:44:16","date_gmt":"2017-02-02T21:44:16","guid":{"rendered":"http:\/\/r2e2.am\/?p=739"},"modified":"2017-03-31T11:48:36","modified_gmt":"2017-03-31T11:48:36","slug":"energy-efficiency-measures-in-masis-medical-center","status":"publish","type":"post","link":"https:\/\/old.r2e2.am\/en\/2017\/02\/02\/energy-efficiency-measures-in-masis-medical-center\/","title":{"rendered":"Energy efficiency measures in Masis Medical Center"},"content":{"rendered":"<p>18.04.2016 In the scope of EEP, the following energy efficiency measures were implemented in\u00a0Masis medical center: replacement of wooden windows by metal-plastic ones,\u00a0replacement of external aluminum doors by metal-plastic ones, the odd windows were\u00a0replaced by walls, insulation of the attic, construction of the boiler-room, renovation of\u00a0hot water supply and heating systems.\u00a0The implemented energy efficiency measures\u00a0provided the 51% efficiency for the building. Director of Masis medical center Vardan\u00a0Mesropyan mentioned that due to the implemented energy efficiency measures even\u00a0during strong winter days, the average temperatures in hospital wards and corridors are\u00a024-25 C.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-2700\" src=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/02\/masis-med-katel-1-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/02\/masis-med-katel-1-300x168.jpg 300w, https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/02\/masis-med-katel-1-768x430.jpg 768w, https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/02\/masis-med-katel-1-1024x573.jpg 1024w, https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/02\/masis-med-katel-1.jpg 1307w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>18.04.2016 In the scope of EEP, the following energy efficiency measures were implemented in\u00a0Masis medical center: replacement of wooden windows by metal-plastic ones,\u00a0replacement of external aluminum doors by metal-plastic ones, the odd windows were\u00a0replaced by walls, insulation of the attic, construction of the boiler-room, renovation of\u00a0hot water supply and heating systems.\u00a0The implemented energy efficiency measures\u00a0provided &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/old.r2e2.am\/en\/2017\/02\/02\/energy-efficiency-measures-in-masis-medical-center\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Energy efficiency measures in Masis Medical Center&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":2697,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[13,5],"tags":[],"_links":{"self":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/739"}],"collection":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/comments?post=739"}],"version-history":[{"count":3,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/739\/revisions"}],"predecessor-version":[{"id":2701,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/739\/revisions\/2701"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media\/2697"}],"wp:attachment":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media?parent=739"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/categories?post=739"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/tags?post=739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}