{"id":7319,"date":"2019-05-27T07:29:23","date_gmt":"2019-05-27T07:29:23","guid":{"rendered":"http:\/\/r2e2.am\/?p=7319"},"modified":"2019-05-27T07:29:23","modified_gmt":"2019-05-27T07:29:23","slug":"%d5%b0%d5%a1%d5%b5%d5%a1%d5%bd%d5%bf%d5%a1%d5%b6%d5%ab-%d5%b0%d5%a1%d5%b6%d6%80%d5%a1%d5%ba%d5%a5%d5%bf%d5%b8%d6%82%d5%a9%d5%b5%d5%a1%d5%b6-%d5%a1%d6%80%d5%a1%d5%a3%d5%a1%d5%ae%d5%b8%d5%bf%d5%b6%d5%ab","status":"publish","type":"post","link":"https:\/\/old.r2e2.am\/en\/2019\/05\/27\/%d5%b0%d5%a1%d5%b5%d5%a1%d5%bd%d5%bf%d5%a1%d5%b6%d5%ab-%d5%b0%d5%a1%d5%b6%d6%80%d5%a1%d5%ba%d5%a5%d5%bf%d5%b8%d6%82%d5%a9%d5%b5%d5%a1%d5%b6-%d5%a1%d6%80%d5%a1%d5%a3%d5%a1%d5%ae%d5%b8%d5%bf%d5%b6%d5%ab\/","title":{"rendered":"Outcomes of \u201cEnergy Efficiency project\u201d implemented in the city of  Talin of Aragatsotn province, RA"},"content":{"rendered":"<p>Armenia R2E2 Fund implements community-based energy efficiency project. In the project framework 5 kW capacity solar photovoltaic system and 4 solar water heaters\u00a0with 300 liter storage tank were installed at the sports school of Talin city to ensure hot\u00a0water supply of the school. 10 kW capacity solar photovoltaic system was installed on the roof of kindergarten N3.<br \/>\nAs a result of energy saving measures implemented in Talin city, annual<br \/>\nreduction of CO\u2082 emission is 16.7 tones, annual energy saving is 3200 kW\/h,<br \/>\nwhich amounts around 1.688.000 AMD.<\/p>","protected":false},"excerpt":{"rendered":"<p>Armenia R2E2 Fund implements community-based energy efficiency project. In the project framework 5 kW capacity solar photovoltaic system and 4 solar water heaters\u00a0with 300 liter storage tank were installed at the sports school of Talin city to ensure hot\u00a0water supply of the school. 10 kW capacity solar photovoltaic system was installed on the roof of &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/old.r2e2.am\/en\/2019\/05\/27\/%d5%b0%d5%a1%d5%b5%d5%a1%d5%bd%d5%bf%d5%a1%d5%b6%d5%ab-%d5%b0%d5%a1%d5%b6%d6%80%d5%a1%d5%ba%d5%a5%d5%bf%d5%b8%d6%82%d5%a9%d5%b5%d5%a1%d5%b6-%d5%a1%d6%80%d5%a1%d5%a3%d5%a1%d5%ae%d5%b8%d5%bf%d5%b6%d5%ab\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Outcomes of \u201cEnergy Efficiency project\u201d implemented in the city of  Talin of Aragatsotn province, RA&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":7320,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[90,5],"tags":[],"_links":{"self":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/7319"}],"collection":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/comments?post=7319"}],"version-history":[{"count":1,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/7319\/revisions"}],"predecessor-version":[{"id":7321,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/7319\/revisions\/7321"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media\/7320"}],"wp:attachment":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media?parent=7319"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/categories?post=7319"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/tags?post=7319"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}