{"id":693,"date":"2017-02-02T21:19:46","date_gmt":"2017-02-02T21:19:46","guid":{"rendered":"http:\/\/r2e2.am\/?p=693"},"modified":"2017-08-30T12:32:12","modified_gmt":"2017-08-30T12:32:12","slug":"pre-bid-meeting-2","status":"publish","type":"post","link":"https:\/\/old.r2e2.am\/en\/2017\/02\/02\/pre-bid-meeting-2\/","title":{"rendered":"Pre-Bid meeting"},"content":{"rendered":"<p>29.04.2015 On April 29, 2015 a pre-biding meeting was held in R2E2 Fund within the framework of the Energy Efficiency Programme for the following tenders: Lot 1. EEM implementation in \u201cInstitute of Physical research\u201d \/ EE-CW-48\/2015.<\/p>\n<p>Representatives of construction and design companies, as well as the experts of the Fund took part in the meeting. The main purpose of the meeting is to present is \u00a0the preparation, submission and evaluation procedures of EEM bid\u2019s applications for the interested organizations. Reports were made by the R2E2 Fund\u2019s procurement specialist Zaruhi Gharagyozyan and EEP consultant Hrant Ter-Gabrielyan\u00a0Zaruhi Gharagyozyan presented the biding package in details and highlighted the importance of the main points, qualification and contract requirements, as well as the reasons for the rejected applications. EEP consultant Hrant Ter-Gabrielyan presented the thermo-technical indicators\/regulatory documents, thermal calculations and financial indicators\/.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-2764\" src=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/02\/pre-bid-meeting-april.-2-min-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/02\/pre-bid-meeting-april.-2-min-300x200.jpg 300w, https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/02\/pre-bid-meeting-april.-2-min-768x512.jpg 768w, https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/02\/pre-bid-meeting-april.-2-min-1024x683.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>29.04.2015 On April 29, 2015 a pre-biding meeting was held in R2E2 Fund within the framework of the Energy Efficiency Programme for the following tenders: Lot 1. EEM implementation in \u201cInstitute of Physical research\u201d \/ EE-CW-48\/2015. Representatives of construction and design companies, as well as the experts of the Fund took part in the meeting. &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/old.r2e2.am\/en\/2017\/02\/02\/pre-bid-meeting-2\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Pre-Bid meeting&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":2763,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[14,5],"tags":[],"_links":{"self":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/693"}],"collection":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/comments?post=693"}],"version-history":[{"count":4,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/693\/revisions"}],"predecessor-version":[{"id":5786,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/693\/revisions\/5786"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media\/2763"}],"wp:attachment":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media?parent=693"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/categories?post=693"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/tags?post=693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}