{"id":638,"date":"2017-02-02T20:39:05","date_gmt":"2017-02-02T20:39:05","guid":{"rendered":"http:\/\/r2e2.am\/?p=638"},"modified":"2017-06-01T11:44:41","modified_gmt":"2017-06-01T11:44:41","slug":"pre-bid-meeting-with-the-representatives-of-construction-organizations","status":"publish","type":"post","link":"https:\/\/old.r2e2.am\/en\/2017\/02\/02\/pre-bid-meeting-with-the-representatives-of-construction-organizations\/","title":{"rendered":"Pre-bid meeting with the representatives of construction organizations"},"content":{"rendered":"<p>12.08.2014 Pre-bid meeting took place at Armenia Renewable Resources and Energy Efficiency Fund on august 12, 2014 about the following on going tenders.<\/p>\n<p><strong>Lot 1.Street lighting in Hrazdan city, EE-CW-29\/2014-1<\/strong><\/p>\n<p><strong>Lot 2. Street lighting in Kapan, EE-CW-29\/2014-2<\/strong><\/p>\n<p><strong>Lot 3. \u00a0Street lighting in \u00a0Artik, EE-CW-29\/2014-3<\/strong><\/p>\n<p>Representatives from construction and design organizations, and R2E2 Fund specialists participate at the discussions. The objective of the meeting was to inform the participants about the the tenders and measures implementing under the project. \u00a0 Procurement specialist Zaruhi Gharagyozyan, energy efficiency project coordinator Segey Abrahamyan.<br \/>\nThe Fund procurement specialist Zaruhi Gharagyozian introduced the bidding documents in details, emphasized the main provisions, qualification requirements, contract terms, and the bids rejection reasons. \u00a0The Fund EE \u00a0project coordinator Sergey Abrahamyan presented \u00a0the street lighting energy \u00a0efficiency technical indicators \/ regulatory documents, electric calculations, financial indices\/.<\/p>","protected":false},"excerpt":{"rendered":"<p>12.08.2014 Pre-bid meeting took place at Armenia Renewable Resources and Energy Efficiency Fund on august 12, 2014 about the following on going tenders. Lot 1.Street lighting in Hrazdan city, EE-CW-29\/2014-1 Lot 2. Street lighting in Kapan, EE-CW-29\/2014-2 Lot 3. \u00a0Street lighting in \u00a0Artik, EE-CW-29\/2014-3 Representatives from construction and design organizations, and R2E2 Fund specialists participate &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/old.r2e2.am\/en\/2017\/02\/02\/pre-bid-meeting-with-the-representatives-of-construction-organizations\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Pre-bid meeting with the representatives of construction organizations&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":2826,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[15,5],"tags":[],"_links":{"self":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/638"}],"collection":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/comments?post=638"}],"version-history":[{"count":5,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/638\/revisions"}],"predecessor-version":[{"id":4375,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/638\/revisions\/4375"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media\/2826"}],"wp:attachment":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media?parent=638"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/categories?post=638"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/tags?post=638"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}