{"id":5257,"date":"2017-07-20T07:11:23","date_gmt":"2017-07-20T07:11:23","guid":{"rendered":"http:\/\/r2e2.am\/?p=5257"},"modified":"2017-07-28T13:51:53","modified_gmt":"2017-07-28T13:51:53","slug":"implemented-works","status":"publish","type":"post","link":"https:\/\/old.r2e2.am\/en\/2017\/07\/20\/implemented-works\/","title":{"rendered":"Implemented works"},"content":{"rendered":"<p><\/p>\n<style>\n   p {    text-indent: 40px; \/* \u041e\u0442\u0441\u0442\u0443\u043f \u043f\u0435\u0440\u0432\u043e\u0439 \u0441\u0442\u0440\u043e\u043a\u0438 \u0432 \u043f\u0438\u043a\u0441\u0435\u043b\u0430\u0445 *\/   }<br \/>  <\/style>\n<p><strong>ESMs are implemented in several facilities included in the project since 2012, particularly:<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>Main school N2 in Masis<\/strong><br \/>\nMain school N2 in Masis\u00a0\u2013 the contract is awarded to \u201cYerknaker\u201d LLC for the implementation of ESMs in Main school N2. The company implemented construction-assembling activities successfully.\u00a0 ESMs implemented in the school include replacement of old windows with new metallic-plastic ones, cleaning and regulating of boiler and others.<\/p>\n<p style=\"text-align: justify;\"><strong>Main school N4 in Ararat city<\/strong><br \/>\nMain school N4 in Ararat city\u00a0the contract is awarded to \u201dSarkoghy\u201d LLC\u00a0 for the implementation of ESMs in Ararat Main school N4.\u00a0 Several construction-assembling activities have been successfully completed,\u00a0 ESMs include\u00a0 replacement of old windows with new metallic-plastic ones, attic insulation and others.<br \/>\nConstruction-assembling\u00a0 activities have been successfully completed in Masis\u00a0 Main school N2\u00a0 and Ararat city Main school N4.<\/p>\n<p style=\"text-align: justify;\"><strong>\u201cMasis\u00a0 Medical Centre\u201d\u00a0 CJSC<br \/>\n<\/strong>\u201cMasis\u00a0 Medical Centre\u201d\u00a0 CJSC<strong>\u00a0<\/strong>the contract was awarded to \u201dLilanarm\u201d LLC in the result of the tender organized by the R2E2 Fund. Construction activities are implementing, ESMs include installation of\u00a0 new Boiler house, replacement of\u00a0 windows and doors\u00a0 with new metallic-plastic ones.<\/p>\n<p style=\"text-align: justify;\"><strong>Main school in Mets Masrik<br \/>\n<\/strong>In the result of the tender the contract was awarded to \u201dYerknaker\u201d LLC\u00a0\u00a0 for the implementation of construction activities. The construction-assembling activities have been already completed and the school shall be exploited soon. In the result of the construction works the old windows\u00a0\u00a0 were replaced with new metallic-plastic ones,\u00a0\u00a0 boiler was cleaned and\u00a0\u00a0 regulated.<\/p>\n<p style=\"text-align: justify;\"><strong>Yerevan State Institute of\u00a0 Theatre and Cinema<br \/>\n<\/strong>Construction activities in Yerevan State Institute of\u00a0 Theatre and Cinema\u00a0\u00a0 are implemented by\u00a0 \u201c Gevorgyan and Nersisyan\u201d LLC, to whom the contract was awarded during\u00a0 the tender organized by the R2E2 Fund. It is planned to replace the windows and doors with new metallic-plastic ones, attic insulation, retrofitting of the\u00a0\u00a0 boiler\u00a0\u00a0 and regulation of\u00a0\u00a0 heating system.<\/p>\n<p style=\"text-align: justify;\"><strong>National Archive of Armenia<br \/>\n<\/strong>National Archive of Armenia<strong>\u00a0<\/strong>the contract was awarded to\u00a0\u00a0\u00a0 \u201dAraman Stone Style\u201d\u00a0 LLC\u00a0\u00a0 in the result of the tender\u00a0\u00a0 for the implementation of construction works at National Archive of Armenia.\u00a0\u00a0 Design activities\u00a0 of the facility have been already going on and construction works\u00a0 will be started\u00a0 soon. During the construction works it is anticipated to rehabilitate\u00a0\u00a0 heating system, replace doors and windows, attic and walls insulation, and others.<\/p>\n<p style=\"text-align: justify;\"><strong>Yerevan school N21 after A. Shirvanzade<br \/>\n<\/strong>Yerevan school N21 after A. Shirvanzade \u201dYerknaker\u201d LLC\u00a0\u00a0 is implementing construction activities. Construction works started in August 15, and it is planned to replace previous windows with new metallic-plastic ones, internal repair of walls and other ESMs.<\/p>\n<p style=\"text-align: justify;\"><strong>Main school N5 in Gavar<br \/>\n<\/strong>Main school N5 in Gavar the contract was awarded to \u201dYerknaker\u201d LLC\u00a0\u00a0 in the result of the tender\u00a0\u00a0 for the implementation of construction activities.\u00a0 In\u00a0 the result of\u00a0construction works heating system of the school will be improved, outside and inside doors will be replaced, windows will replaced with metallic-plastic ones, internal walls will be repaired.<\/p>\n<p style=\"text-align: justify;\"><strong>Preschool\u00a0 N3 in the city of Vayk<br \/>\n<\/strong>Preschool\u00a0 N3 in the city of Vayk\u00a0construction works are implemented by \u201cSarkoghy\u201d LLC, to whom the contract was awarded in the tender. Currently construction works are implemteing and it is planned to replace old windows with new metallic plastic ones, cleaning and regulation of the boiler.<\/p>\n<p style=\"text-align: justify;\"><strong>Vayk city street lighting<br \/>\n<\/strong>Vayk city street lighting\u00a0contract was awarded to \u201cSarloghy\u201d LLC to implement street lighting\u00a0 in Vayk. ESMs include replacement of fluroscent lamps with energy efficient ones, installation\u00a0 and painting of columns and others.<\/p>\n<p style=\"text-align: justify;\"><strong>Dilijan city street lighting<br \/>\n<\/strong>Dilijan city street lighting\u00a0contract was awarded to \u201cMihrshin\u201d LLC to implement street lighting in Dilijan city in the scope of the energy saving measures. Activities started in\u00a0 august 22.\u00a0 ESMs include replacement of fluroscent lamps with energy efficient ones.<\/p>\n<p style=\"text-align: justify;\"><strong>Armenia State Economic University<br \/>\n<\/strong>Armenia State Economic University<strong>\u00a0<\/strong>construction works will be implemented by \u201cZet Profile\u201d LLC. It is planned to replace outside doors and windows with metallic plastic ones, boiler and subsidiary equipment dismounting, gas connection and water supply, water sewage, air ventilation activities and others.<\/p>\n<p style=\"text-align: justify;\"><strong>Nigavan Secondary School<br \/>\n<\/strong>Construction works were implemented by \u201cDustr Margarita\u201d LLC, who won the tender announced by the Fund. During construction the following works have been implemented: installation of boilers, required equipment and internal thermal network, construction of external gas pipeline and thermal insulation of the attic.<\/p>\n<p style=\"text-align: justify;\"><strong>Yerevan Primary School N 163<br \/>\n<\/strong>Construction works were implemented by \u201cNerses ev Ynkerner\u201d LLC. The following works were implemented during the construction: \u00a0Replacement of windows with more energy efficient ones, replacement of the external doors with insulated wall, installation of heat reflectors and partial insulation of walls.<\/p>\n<p style=\"text-align: justify;\"><strong>Yerevan Primary School N 187<br \/>\n<\/strong>The following works were implemented by \u201cGevorgyan ev Nersisyan\u201d LLC: installation of heat reflectors on walls behind the heating radiators, replacement of the windows, partial replacement of the windows by walls, replacement of external doors by more efficient ones, etc..<\/p>\n<p style=\"text-align: justify;\"><strong>Primary School N1 after J. Mkrtchyan<br \/>\n<\/strong>The following works were implemented by \u201cSarkoghi\u201d LLC who won the tender announced by the Fund: installation of heat reflectors, replacement of inefficient windows, replacement of external doors, and partial replacement of windows by walls.<\/p>\n<p style=\"text-align: justify;\"><strong>Primary School N66 after A. Myasnikyan<br \/>\n<\/strong>\u201cNerses ev Ynkerner\u201d LLC implemented the following works: replacement of windows, partial replacement of windows by insulated walls, as well as replacement of external doors and installation of heat exchangers.<\/p>\n<p style=\"text-align: justify;\"><strong>Street Lighting of Artik<br \/>\n<\/strong>The following energy efficiency works were implemented by \u201cZet Profile\u201d LLC: replacement of dimmable mercury lamps by energy efficient high pressure sodium lamps, as well as regulatory works of lighting network control and calculation systems.<\/p>\n<p style=\"text-align: justify;\"><strong>Street lighting of Ijevan<br \/>\n<\/strong>The winner of announced tender \u201cBaspet\u201d LLC implemented the following works in Ijevan: \u00a0Replacement of wires with new ones, replacement of mercury lamps by more powerful lights, replacement of ordinary meters by double tariff ones, improvement of lighting network parameters, installation of street lightings.<\/p>\n<p style=\"text-align: justify;\"><strong>Street lighting of Hrazdan<br \/>\n<\/strong>\u201cZet Profile\u201d LLC implemented the following energy efficiency works in Hrazdan: replacement of mercury lamps by equivalent sodium fixtures, regulation of control and calculation systems, installation of missing poles and lighting fixtures and pole painting.<\/p>\n<p style=\"text-align: justify;\"><strong>\u00a0Primary School N61 of Yerevan<br \/>\n<\/strong>The winner of announced tender \u201cZet Profile\u201d LLC implemented the following construction works: replacement of windows by more energy efficient ones, thermal insulation of ceiling, replacement of external doors by more efficient ones, replacement of an external door with insulated wall.<\/p>\n<p style=\"text-align: justify;\"><strong>School N2 of Dilijan<br \/>\n<\/strong>Construction works in the school N2 of Dilijan was\u00a0implemented by \u201cArsev\u201d LLC, to which the contract was awarded by the Fund.<br \/>\nThe following works were implemented in the scope of energy efficiency<br \/>\nmeasures: replacement of old windows with new metal-plastic ones, replacement\u00a0of windows by insulated walls, replacement of exterior doors by metal-plastic\u00a0ones, construction of division wall for heating and non-heating areas, insulation of\u00a0the 1st building\u2019s attic and installation of heat reflectors on the walls behind the\u00a0radiators.<\/p>\n<p style=\"text-align: justify;\"><strong>Street lighting of Kapan<br \/>\n<\/strong>The contract for implementation of energy efficiency\u00a0measures was awarded to \u201cSarkoghi\u201d LLC. In the scope of energy efficiency\u00a0measures the following works were carried out: replacement of mercury lamps by\u00a0the high-pressure natrium lamps of the same quantity providing equivalent\u00a0lighting, regulation of accounting and management systems, improvement of\u00a0lighting network parameters, replacement of old supply wires, installation of\u00a0missing high-pressure natrium lamps, lighting fixtures and columns.<\/p>\n<p style=\"text-align: justify;\"><strong>Street lighting of Sisian<br \/>\n<\/strong>The contract for implementation of energy efficiency measures in Sisian was awarded to \u201cSarkoghi\u201d LLC. In the scope of the project they implemented the following works: replacement of mercury lamps and fixtures by the equivalent high-pressure natrium lamps, incandescent lmaps for decoration lighting were replaced by the efficient ones, regulation of accounting and management system, improvement of lighting network parameters, painting of lighting columns.<\/p>\n<p style=\"text-align: justify;\"><strong>School N44 named after Hrant Dink<br \/>\n<\/strong>In the scope of the Project, \u201cSarkoghi\u201d LLC implemented the following construction works: partial insulation of interior walls, replacement of non-efficient windows, partial replacement of windows bay insulated walls, replacement of exterior doors by efficient ones, as well as modification of internal network.<\/p>\n<p style=\"text-align: justify;\"><strong>Municipality of Artashat<br \/>\n<\/strong>Energy efficiency measures in Municipality of Artashat were implemented by \u201cZet Profile\u201d LLC. The following works were carried out: replacement of windows by energy efficient ones, division of heating and non-heating areas, replacement of exterior doors by efficient ones, installation of interior heating network, installation of boiler and other necessary equipment, construction of gas pipelines, installation of pressure regulation and accounting systems.<\/p>\n<p style=\"text-align: justify;\"><strong>Ashtarak Medical Center<br \/>\n<\/strong>For implementation of energy efficiency measures in Ashtarak Medical Center, the contract was awarded to \u201cZet Profile\u201d LLC. The following works were implemented in the scope of the project: replacement of windows by efficient ones, insulation of walls under windows, replacement of exterior doors by efficient ones, installation of internal heating system, re-equipment of boiler room, insulation of the attic, installation of external heating system.<\/p>\n<p style=\"text-align: justify;\"><strong>\u201cInstitute of physical research\u201d of National Academy of Science, RA<br \/>\n<\/strong>For the implementation of the energy efficiency measures, the contract was granted to \u201cBideq\u201d LLC. The following works were carried out: replacement of windows by efficient ones, replacement of transparent surfaces by insulated walls, replacement of external doors by efficient ones, works of partial insulation, re-equipment of boiler room, internal finishing works of the walls.<\/p>\n<p style=\"text-align: justify;\"><strong>Special school N2 of Vagharshapat<br \/>\n<\/strong>In special school N2 of Vagharshapat the contract for implementation of energy efficiency measures was granted to \u201cGevorgyan &amp; Nersisyan\u201d LLC. The following works were carried out: replacement of windows by efficient ones, replacement of external doors by efficient ones, insulation of attic, partial replacement of windows by insulated walls.<\/span><\/p>\n<p style=\"text-align: justify;\"><strong>Vagharshapat School N8 named after G. Njdeh<br \/>\n<\/strong>The contract for implementation of energy efficiency measures in school N8 of Vagharshapat was awarded to \u201cArsev\u201d LLC. The following works were implemented in the school: replacement of non-efficient windows by new metal-plastic ones, partial replacement of windows by insulated walls, replacement of non-efficient external doors by metal-plastic ones, insulation of the attic in the 1<sup>st<\/sup>\u00a0building.<\/p>\n<p style=\"text-align: justify;\"><strong>High-Voltage Electrical networks (South Branch)<br \/>\n<\/strong>The contract for implementation of energy efficiency measures in South branch of HVEN was awarded to \u201cZet Profile\u201d LLC. The following energy efficiency measures were implemented: insulation of external concrete walls, installation of heating network of the roof, installation of the boiler and necessary equipment, construction of external gas pipeline.<\/p>\n<p style=\"text-align: justify;\"><strong>\u00a0High-Voltage Electrical networks (Eastern Branch)<br \/>\n<\/strong>The contract for implementation of energy efficiency measures in Eastern branch of HVEN was awarded to \u201cDustr Margarita\u201d LLC. The following energy efficiency measures were implemented: replacement of windows by efficient ones, insulation of the roof, installation of interior heating network, installation of boiler and other necessary equipment, installation of the gas pipeline and regulatory computing junction, replacement of doors by efficient ones.<\/p>\n<p style=\"text-align: justify;\"><strong>High-Voltage Electrical networks (Goris and Zangezur Branch)<br \/>\n<\/strong>The contract for implementation of energy efficiency measures in Goris and Zangezur branch of HVEN was awarded to \u201cSarkoghi\u201d LLC. The following energy efficiency measures were implemented: replacement of non-efficient windows by efficient ones, replacement of non-efficient doors\u00a0 by efficient ones, insulation of the roof by slag, installation of the gas pipeline and regulatory computing junction, installation of internal heating network, installation of condensation boilers and boiler equipment.<\/p>\n<p style=\"text-align: justify;\"><strong>\u00a0<\/strong><strong>Street lighting of Akhuryan village in Shirak region<br \/>\n<\/strong>The contract for implementation of energy efficiency measures in the village Akhuryan was awarded to \u201cYerknaqer\u201d LLC. The following energy efficiency measures were implemented in the scope of the project: replacement of mercury lamps by the same quantity of high-pressure natrium lamps of equivalent lighting parameters, replacement of 250 DRL lights by the same quantity of high-pressure natrium lamps providing equivalent lighting, replacement of 100W incandescent decorative lamps by 30W or equivalent lamps, management of regulatory and computing systems, improvement of lighting network parameters, installation of new lighting columns with lighting fixtures, installation of missing street lights, painting of the columns.<\/p>","protected":false},"excerpt":{"rendered":"<p>ESMs are implemented in several facilities included in the project since 2012, particularly: Main school N2 in Masis Main school N2 in Masis\u00a0\u2013 the contract is awarded to \u201cYerknaker\u201d LLC for the implementation of ESMs in Main school N2. The company implemented construction-assembling activities successfully.\u00a0 ESMs implemented in the school include replacement of old windows &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/old.r2e2.am\/en\/2017\/07\/20\/implemented-works\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Implemented works&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":2721,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[9,10,42],"tags":[],"_links":{"self":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/5257"}],"collection":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/comments?post=5257"}],"version-history":[{"count":23,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/5257\/revisions"}],"predecessor-version":[{"id":5521,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/5257\/revisions\/5521"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media\/2721"}],"wp:attachment":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media?parent=5257"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/categories?post=5257"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/tags?post=5257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}