{"id":5232,"date":"2017-07-14T13:11:28","date_gmt":"2017-07-14T13:11:28","guid":{"rendered":"http:\/\/r2e2.am\/?p=5232"},"modified":"2017-07-27T20:57:51","modified_gmt":"2017-07-27T20:57:51","slug":"evaluation-results","status":"publish","type":"post","link":"https:\/\/old.r2e2.am\/en\/2017\/07\/14\/evaluation-results\/","title":{"rendered":"Evaluation results of Prequalification Applications for \u201cMasrik-1 Utility-Scale Solar Photovoltaic Project in Armenia\u201d"},"content":{"rendered":"<p>14.07.2017<\/p>\n<p>&nbsp;<\/p>\n<p>As a result of evaluation of Prequalification (PQ) applications based on the technical, financial and legal criteria specified in the Invitation to submit the PQ Applications for Masrik-1 Utility-Scale Solar Photovoltaic Project in Armenia, the Evaluation Commission approved the following shortlisted 10 organizations\/consortium that passed the prequalification stage and became eligible to participate in the second stage of bidding process:<\/p>\n<p>&nbsp;<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"54\">1<\/td>\n<td width=\"570\">TBEA Xinjiang Sunoasis Co., Ltd, China \u00a0\u2013Subsolar Energy Holding LLC, the Netherlands<\/td>\n<\/tr>\n<tr>\n<td width=\"54\">2<\/td>\n<td width=\"570\">Phelan Energy Group Limited, South Africa \u2013Korea Electric Power Corporation<\/td>\n<\/tr>\n<tr>\n<td width=\"54\">3<\/td>\n<td width=\"570\">Shapoorji Pallonji Infrastructure Capital Company Private Limited, India \u2013 Risen Energy Co. Limited, China<\/td>\n<\/tr>\n<tr>\n<td width=\"54\">4<\/td>\n<td width=\"570\">Metka, Greece \u00a0\u2013 Energy Phoenix, Lebanon<\/td>\n<\/tr>\n<tr>\n<td width=\"54\">5<\/td>\n<td width=\"570\">Access Infra Central Asia Limited, U.A.E \u00a0\u2013 Eren Renewable Energy S.A., France \u2013 TSK Electronica, Spain<\/td>\n<\/tr>\n<tr>\n<td width=\"54\">6<\/td>\n<td width=\"570\">Fotowatio Renewable Ventures B.V, Netherlands \u2013FSL Solar S.L., Country: Spain<\/td>\n<\/tr>\n<tr>\n<td width=\"54\">7<\/td>\n<td width=\"570\">Acciona Energia S.A.U., Spain<\/td>\n<\/tr>\n<tr>\n<td width=\"54\">8<\/td>\n<td width=\"570\">Building Energy Development Africa, Italy \u2013H1 Holdings (Pty) Ltd, South Africa<\/td>\n<\/tr>\n<tr>\n<td width=\"54\">9<\/td>\n<td width=\"570\">Sky Power Global, Cayman \u00a0\u2013Enerparc Projects GMBH, Germany<\/td>\n<\/tr>\n<tr>\n<td width=\"54\">10<\/td>\n<td width=\"570\">CountourGlobal LP, Cayman Islands<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>14.07.2017 &nbsp; As a result of evaluation of Prequalification (PQ) applications based on the technical, financial and legal criteria specified in the Invitation to submit the PQ Applications for Masrik-1 Utility-Scale Solar Photovoltaic Project in Armenia, the Evaluation Commission approved the following shortlisted 10 organizations\/consortium that passed the prequalification stage and became eligible to participate &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/old.r2e2.am\/en\/2017\/07\/14\/evaluation-results\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Evaluation results of Prequalification Applications for \u201cMasrik-1 Utility-Scale Solar Photovoltaic Project in Armenia\u201d&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":4763,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[6,5],"tags":[],"_links":{"self":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/5232"}],"collection":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/comments?post=5232"}],"version-history":[{"count":11,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/5232\/revisions"}],"predecessor-version":[{"id":5450,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/posts\/5232\/revisions\/5450"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media\/4763"}],"wp:attachment":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media?parent=5232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/categories?post=5232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/tags?post=5232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}