{"id":225,"date":"2017-01-30T22:00:18","date_gmt":"2017-01-30T22:00:18","guid":{"rendered":"http:\/\/r2e2.am\/?page_id=225"},"modified":"2017-04-19T11:36:01","modified_gmt":"2017-04-19T11:36:01","slug":"programs","status":"publish","type":"page","link":"https:\/\/old.r2e2.am\/en\/programs\/","title":{"rendered":"Programs"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Windpower-in-Armenia.pdf\">Windpower-in-Armenia<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Renewable-Energy-Roadmap-for-Armenia.pdf\"> Renewable Energy Roadmap for Armenia<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/A-preliminary-feasibility-assessment-of-the-Preferred-alternative-for-implementing-a-commercial-scale-bio-ethanol-fuels-program-for-Armenia.pdf\"> A preliminary feasibility assessment of the Preferred alternative for implementing a Commercial scale bioethanol fuels program for Armenia in the near to mid term<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Demand-Side-Management-Study.pdf\">Demand-Side Management Study<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Charged-DecisionsDifficult-Choices-in-Armenias-Energy-Sector.pdf\">Charged Decisions: Difficult Choices in Armenia\u2019s Energy Sector(World Bank)<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Wind-Potential-Report_Eng.pdf\"> Wind Energy in Armenia: Overview of Potential and Development Perspectives<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Wind-Development_Legal_Eng.pdf\">Wind Energy Development in Armenia: Legal, Regulatory, Tax and Customs Regulations<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Summary-Technical-Report-Year-1.pdf\"> Armenia energy security and regional integration (Summary of year 1 technical results)<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Solar-Energy-Connection-Standard_ENG.pdf\"> Connection of Photovoltaic Power Plants (with up to 5 MW of capacity) to the Common Grid of Electrical Power System<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Proposed-Methodology-for-Transmission-Line-Cost-Benefit-Analysis.pdf\"> Methodology for Evaluating the Economics, Financial Viability and Environmental Consequences of Proposed Georgian Interconnection and Transmission Line Options<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Overview-on-solar-electric-power-in-buildings.pdf\">Overview on Solar Electric Power in Buildings with Applications in Armenia<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Model-WPPA.pdf\">Contract for the sale and purchase of electricity generated by wind power<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Developing-an-Improved-WPPA-for-Armenia.pdf\">Developing an improved wind power purchase agreement for Armenia<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/Congestion-Management.pdf\"> Congestion management in European grid and Applicability of Methodologies for Armenia draft report<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/2006-LCGP-Report.pdf\"> Armenia Power Sector 2006 Least Cost Generation Plan<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/App.-A-LCGP_2006-.pdf\">APPENDIX A: ANPP Upgrade Projects, Decommissioning, Life Extension and Replacement Issues and Cost<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/App.-B-LCGP_2006.pdf\">APPENDIX B: Renewable Energy Technologies and Resources<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/App.-C-LCGP_2006.pdf\">APPENDIX C: Capital Structure of the Electric Sector Companies<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/App.-D-LCGP_2006.pdf\">APPENDIX D: Electricity Demand Forecast<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2012\/08\/App.-E-LCGP_2006.pdf\">APPENDIX E: Fuel Price Forecast Update<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/old.r2e2.am\/wp-content\/uploads\/2017\/01\/App.-F_LCGP_2006.pdf\">APPENDIX F: Results of Detailed Analysis<\/a><\/strong><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>&nbsp; Windpower-in-Armenia Renewable Energy Roadmap for Armenia A preliminary feasibility assessment of the Preferred alternative for implementing a Commercial scale bioethanol fuels program for Armenia in the near to mid term Demand-Side Management Study Charged Decisions: Difficult Choices in Armenia\u2019s Energy Sector(World Bank) Wind Energy in Armenia: Overview of Potential and Development Perspectives Wind Energy &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/old.r2e2.am\/en\/programs\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Programs&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/static-page-3.php","meta":[],"_links":{"self":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/pages\/225"}],"collection":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/comments?post=225"}],"version-history":[{"count":6,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/pages\/225\/revisions"}],"predecessor-version":[{"id":3249,"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/pages\/225\/revisions\/3249"}],"wp:attachment":[{"href":"https:\/\/old.r2e2.am\/en\/wp-json\/wp\/v2\/media?parent=225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}